Milestones

Completed structured cabling projects with a cumulative length of 110,410 meters of combined 24-core multi-mode and single-mode fiber optic cables and over 4,930,000 meters UTP cables for more than 58,000 voice and data users.

Started building data centers or computer centers in 1991, designed and completed 52 data centers/computer centers of which 5 are internet data center grade.

Design, supplied and installed cumulatively 230 Tr of Precision Air Conditioning Unit (PACU); Design, supplied and installed cumulatively 3,240 KW of Uninterruptible Power Supply; Design, supplied and installed cumulatively 5,125 heat and smoke detectors of Fire Detection and Alarm System (FDAS).

Supplied, installed and configured the 1st Ethernet 10Base-T switch in the Philippines at University of the Philippines in 1994. Supplied, installed and configured the first Cisco router in the Philippines for Shell Petroleum in 1989.

The 1st Technology migration from token ring and Ethernet to high speed Asynchronous Transfer Mode (ATM) was implemented by MFL at Caltex Refinery San Pascual Batangas.

Completed an off-building to a new site relocation and transfer of Data Center Equipment within a period of 14- hours from equipment dismantling, hauling, reinstallation, power-up, functionality and stabilization.