Over the years we have accomplished major milestones, here are some of our highlights.

cabling
Completed structured cabling projects with a cumulative length of 110,410 meters of combined 24-core multi-mode and single-mode fiber optic cables and over 4,930,000 meters UTP cables for more than 58,000 voice and data users.
data centers
Started building data centers or computer centers in 1991, designed and completed over 55 data centers/computer centers of which several are internet data center grade.
pacu
Design, supplied and installed cumulatively over 300 Tr of Precision Air Conditioning Unit (PACU); Design, supplied and installed cumulatively over 5000 KW of Uninterruptible Power Supply; Design, supplied and installed cumulatively over 6000 heat and smoke detectors of Fire Detection and Alarm System (FDAS)
up
Supplied, installed and configured the 1st Ethernet 10Base-T switch in the Philippines at University of the Philippines in 1994.
caltex
The 1st Technology migration from token ring and Ethernet to high speed Asynchronous Transfer Mode (ATM) was implemented by MFL at Caltex Refinery San Pascual Batangas.
Cisco
Supplied, installed and configured the first ever Cisco router in the Philippines for Shell Petroleum in 1989.
off building
Completed an off-building to a new site relocation and transfer of Data Center Equipment within a period of 14-hours from equipment dismantling, hauling, reinstallation, power-up, functionality and stabilization.